Choosing to renovate your house is a big decision. But after making that decision, the next steps can seem confusing. You want to take the utmost care of your home, and be sure the people you trust with your home feel the same way, too.
So whether you’ve chosen to renovate your entire home or just a room, DYM Builders has a guide on how to prepare before breaking ground.
Find a Trusted Contractor
Enlisting the help of a trusted contractor is the essential first step to any successful renovation. Not all contractors deliver the same quality, so take these steps to choose the right partner:
- Verify Credentials: Check that the contractor holds active licenses and insurance in your local jurisdiction.
- Read Multiple Reviews: Look up client feedback across independent review platforms to see past project performance.
- Request Past References: Ask for direct contact details of past clients to ask about their experience.
- Evaluate Communication: Treat consultations like a job interview to ensure the contractor respects your vision, timeline, and budget.
- Confirm Start Dates: Ensure the contractor provides a realistic kickoff date rather than a vague schedule. If a contractor seems unsure when they can fit you in, they may not be reliable throughout your build.
Source Your Materials
Once you’ve worked through the design and planning elements of your renovation with your contractor, it’s time to source materials. Your contractor will be in charge of sourcing materials such as framing, plumbing, and electrical equipment and will be sure to get you the best quality.
But you as the homeowner have a say in some of the other materials in your home, including flooring, paint, cabinetry, fixtures, and appliances. A trusted contractor such as DYM Builders will provide you with vendors who can source such materials.
In the past, contractors waited to get all or most of their materials before starting a renovation. But with supply chain issues impacting the industry the last few years, there’s been more waiting periods, and more materials going out of stock.
Trusted vendors should be able to tell you what is in stock and what you’ll need to wait for. Additionally, if a material you wanted is out of stock or unable to be delivered, your contractor can help you pick an alternative.
“Our job is to bring them as close as possible, so sometimes they don’t even care about the replacement. Or, sometimes it’s something that’s even better than what they imagined.” — David Malka, co-owner of DYM Builders
Decide If You Can Stay Home
You’ll work through the timeline of your project with your contractor from day one. Your schedule will partly depend on if you can live at home during the renovation. Sometimes, full-scale renovations can be finished quicker if the homeowner isn’t present for the renovation, Malka explains. However, relocating during the renovation can be costly, especially in competitive rental markets.
Discuss your plans with both your contractor and your family. If you’re only renovating one or two rooms, you may be able to stay in your house and make adjustments to your daily routine while certain areas of the house are renovated. For example, you may be able to renovate one bathroom at a time so you always have one available. Or, you can stay in your house and make do without your kitchen while it’s renovated.
The decision is a personal one that will depend on your situation. But be sure to take the costs of displacement into account when building your budget.
Estimated Timeline & Living Impact by Renovation Type
Planning where to live depends on the scale of your project. Here is how typical renovation timelines and living situations compare:
| Renovation Type | Average Timeline | Can You Live at Home? | Main Preparation Step |
|---|---|---|---|
| Single Bathroom Remodel | 3 to 4 weeks | Yes, if a second bathroom is available | Pack away toiletries, clear drawers, and set up temporary routines |
| Kitchen Renovation | 6 to 8 weeks | Yes, with a temporary kitchen setup | Move dry goods, set up a temporary microwave and fridge station |
| Room Addition | 2 to 3 months | Yes, during exterior work; limited during tie-in | Seal off construction dust barriers and clear nearby exterior yards |
| Full Home Remodel | 4 to 7 months | No, temporary relocation recommended | Clear out all furniture, secure long-term rentals, and box belongings |
Get Funds Prepared
Your budget is a vital part of the renovation. Whether you’re financing your renovation or paying for it in cash, contractors prefer to know their clients have funds prepared from the get-go.
Because construction is usually paid for in stages, you’ll most likely be paying your contractor before the end of your project. And your contractor has to pay their employees and subcontractors. So if you can’t pay, it causes a chain reaction of other problems.
Remove Personal Items from Home
You’ll most likely be responsible for clearing out any personal items from the rooms that are being renovated. So if your bathroom will be renovated, you’ll have to clear out your shower, your cabinets, and drawers.
But you should also take care to remove any personal items from the rest of your house, including anything on the walls or on shelves. Construction and renovation can be a rough process. With lots of people and equipment coming through the house, things can get jostled or misplaced. Keep them in your basement, garage, or storage area during the duration of the renovation.
10-Step Home Renovation Preparation Checklist
Following a structured checklist before work begins keeps your home safe and your schedule on track:
- Verify Credentials: Confirm license status, insurance coverage, and local references for your chosen contractor.
- Finalize Material Selections: Select flooring, paint, cabinets, and fixtures early to check inventory lead times.
- Approve Project Budget: Establish a clear payment milestone schedule and secure financing ahead of time.
- Confirm Start Date: Agree on a firm project kickoff date and daily work hours with your contractor.
- Create Dust Barriers: Ensure your crew seals off non-work areas using plastic sheeting and zip doors.
- Clear Work Areas: Remove all furniture, rugs, wall art, and decor from active construction zones.
- Protect Adjacent Rooms: Take down hanging pictures or fragile objects on shared walls in adjacent rooms.
- Establish Living Plans: Decide whether you will stay in the house or set up temporary housing elsewhere.
- Designate Storage Space: Clear a section of your garage, basement, or storage unit for boxed items.
- Set Up Communication: Agree on daily or weekly progress updates with your project manager.
Get Ready for Your New Home
Take a deep breath – you are prepared to take on your renovation! Working with an experienced design-build team ensures that every phase of preparation leads to a smooth construction process. Proper planning saves you time, protects your budget, and prevents unnecessary stress along the way. When you take these necessary steps before breaking ground, you can relax and watch your dream space come to life with complete peace of mind.
Ready to start your home transformation?
Call DYM Builders Group today at 800-396-6773 or visit our website to schedule your consultation!
Frequently Asked Questions
How far in advance should I start preparing for a home renovation?
It is best to start planning and vetting contractors 3 to 6 months before your target start date. This timeframe gives you enough room to finalize design choices, secure necessary city permits, and order long-lead materials like custom cabinets or imported tile.
What is the most expensive part of a home renovation?
Labor and structural changes are typically the largest expenses. In room-specific projects, kitchens and bathrooms cost the most per square foot due to complex plumbing, electrical wiring, custom cabinetry, and countertop installations.
How much extra should I set aside in a contingency fund?
You should reserve an extra 10 to 20 percent of your total project budget for unexpected expenses. Hidden issues like outdated wiring, plumbing leaks behind walls, or structural rot are often uncovered only after demolition begins.
How can I protect my remaining living space from construction dust?
Ask your contractor to set up plastic zip-wall barriers, cover HVAC vents in active work areas, and lay down floor protection along main entry walkways. Replacing your home air filters frequently during construction also helps keep air quality clean.
Do I need a permit for an interior home renovation?
Simple cosmetic updates like painting, replacing flooring, or swapping light fixtures usually do not require permits. However, any project that involves moving walls, altering plumbing lines, adding electrical circuits, or expanding structural foundations requires official city or county permits.